Pre-Engineered Modular Building for Heavy Industry Manufacturer

W. W. Cannon  started construction yesterday on a 32′ x 12′ two-story pre-engineered Starrco modular building for a heavy industry manufacturer.  Check back this week to see updates on the quick progress of modular buildings.

This entry was posted in Blog. Bookmark the permalink.