Installation Update of Pre-Engineered Modular Office

W. W. Cannon Installation Team is progressing quickly on the two-story pre-engineered Starrco Modular Office for a heavy industry manufacturer.  Installation started last week and the second floor is up and the stair is being installed.  This building will provide office space on the production floor and windows across the front provide a view of the production floor.

This entry was posted in Blog. Bookmark the permalink.